Quality control of raw material purchase

  • Chemical analysis of raw materials

    Direct reading spectrometer made by German OBLF

    100% chemical analysis of steel ingots for each lot

  • Detection of non-metallic inclusion

    Inspection of non-metallic inclusion in raw material

    100% sampling test for each lot

Detection of process

Heat treatment control

Test of temperature uniformity of heat treatment furnace

Check the loading condition before entering the furnace(loading weight、number of bars、forging spacing)

Ensure the time of quenching into water within 50s

Control the water temperature below 40℃(by two sets of cooling system)

Control and record furnace temperature uniformity curve

Final inspection

Visual inspection

Visual inspection

Hardness test

Ultrasonic test

Magnetic /Penetrant test

Positive material identification

Perfect physical and Chemical laboratory